• Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer
  • Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer
  • Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer
  • Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer
  • Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer
  • Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer

Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer

Certification: CE, ISO, ASME and En
Customized: Customized
Surface Treatment: Painted
Fuel: Coal
Range of Applications: Power station, Industrial
productnaam: Boiler Economizer Bank

Neem contact op met de leverancier

Gouden Lid Sinds 2024

Leveranciers met geverifieerde zakelijke licenties

Jiangsu, China
Jarenlange exportervaring
De exportervaring van de leverancier is meer dan 10 jaar
Tentoonstelling Ervaring
De leverancier heeft deelgenomen aan offline beurzen. U kunt de Audit Report raadplegen voor meer informatie
Gestandaardiseerde kwaliteitscontrole
De leverancier beschikt over een compleet en gestandaardiseerd kwaliteitscontroleproces, bekijk de Audit Report voor meer informatie
R&D-mogelijkheden
De leverancier beschikt over 10 R&D-ingenieurs. U kunt de Audit Report raadplegen voor meer informatie
om alle geverifieerde sterktelabels te bekijken (25)
  • Overzicht
  • Product Description
  • Detailed Photos
  • Product Parameters
  • FAQ
Overzicht

Basis Informatie.

Model NR.
HDBECO1
toepassing
Waster Incinerator Replacement
materiaal
SA213t11 and SA36
productietechniek
Tube Bending and Butt Welding
bijlagen
Handcuffs and Shields
Thickness of Shields
3,5 mm
Transportpakket
Steel Frame and Wooden Box
Specificatie
L10010mm*W1900mm*H2000mm
Handelsmerk
HDB
Oorsprong
China
Gs-Code
8402900000
Productiecapaciteit
9000 Tons/Year

Beschrijving

Product Description

 

Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.
The tubular economizer consists of a series of parallel serpentine tubes, which are made of seamless steel pipes with an outer diameter of 25 ~ 42 mm, and the pipes are usually arranged in a staggered arrangement.

 
Detailed Photos

 

Carbon Steel Power Station Coal-Fired Boiler Fin Tube EconomizerCarbon Steel Power Station Coal-Fired Boiler Fin Tube EconomizerCarbon Steel Power Station Coal-Fired Boiler Fin Tube EconomizerCarbon Steel Power Station Coal-Fired Boiler Fin Tube EconomizerCarbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer
Product Parameters
 
Description Boiler economizer
Material of Base Tube SA210A1
Material standard ASTM
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   
FAQ

 

Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.


Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese

Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.
 

Stuur uw aanvraag naar deze leverancier

*van:
*naar:
*bericht:

Voer tussen 20 tot 4000 karakters.

Dit is niet wat je zoekt? Plaats Nu het Verzoek tot Scourcing

Zoek vergelijkbare producten op categorie

Startpagina leverancier Producten Boiler voorverwarmer Carbon Steel Power Station Coal-Fired Boiler Fin Tube Economizer

Misschien Vind Je Het Leuk

Neem contact op met de leverancier

Gouden Lid Sinds 2024

Leveranciers met geverifieerde zakelijke licenties

Fabrikant/fabriek
Aantal Werknemers
203
Jaar van Oprichting
1989-11-20